The start of the project for the implementation of electrical equipment and precision instruments in Oraman industrial zone is in May 2017. In November 2017, it was successfully delivered temporarily.

The 6-month warranty period has been definitively delivered after this period.

Equipping the workshop by using appropriate machinery is one of the strengths of the project.

After equipping the workshop and establishing executive and engineering teams, 12 tons of metal support and support structures were built.

۳۷۰۰ meters of tray and ladder were placed on the prefabricated paths in the structures and trenches.

Cabling More than 50,000 meters of high, medium and accurate pressure cables were implemented.

Lighting fixtures were installed, including projectors and skylights for sheds and buildings.

The Earthing system was one of the stages of the project to implement electrical equipment and precision instruments in the industrial area.

Includes tanks, electric motors, electrical panels, metal structures of buildings, sheds.

In addition to installing the electrical panels, more than 300 electrical equipment and precision instruments were connected with the connection.

۳۵,۰۰۰ concussions were successfully performed with specialized tests and subsequent launches.

The scaffolding, along with the lift and sludge, provided a good working bed height.

The project for the implementation of electrical equipment and precision instruments in the industrial area of ​​Oraman was special in terms of location, access and time frame.

And it faced many technical and executive problems.

The company’s executive teams spared no effort and worked tirelessly to acquire the employer’s consent.

The unbearable heat of the desert, in addition to the presence of vermin in the workshop, increased the duties of safety agents.

Leaving aside the specific conditions of the project, the employer’s cooperation during the project has had a significant impact on the implementation process.

 